HOW TO OBTAIN A PERMIT TO INSTALL A “NEW” PRIVATE
WATER SYSTEM IN ASHLAND COUNTY, OHIO
or
To see the procedure for altering an existing water
system please click HERE
Any person who plans to construct, develop, or install a NEW
private water system or component thereof in
Ashland County, Ohio must follow these steps:
1. Obtain a Private Water System Application/Permit form from the
Ashland County-City Health Department:
110
Cottage Street, Ashland, Ohio 44805
Phone 419-282-4337
Mon.
Fri 8:00 a.m. 4:00 p.m.
The application/permit requires information
relative to the location,
design, construction, installation and development
of your new
single family or non-single family dwelling-building
water system,
including a site plan drawing to an appropriate
scale showing
the property and other specific information
that will
exactly identify the location of the site.
In addition,
all plans submitted for the location, design,
construction,
installation and development of a non-single
family dwelling/building
shall include the information required by Rules
3701-28-03(E) and (F).
The completed application/permit with site plan
for a
single family dwellingbuilding must be returned
to this department
with a fee of $245.00.
The completed application/permit with site plan
and all
other required information for a non-single
family dwelling/building
must be returned to this departmentwith a fee
of $270.00.
2. Upon filing the application/permit a department sanitarian will
determine
whether the proposed private water system meets
all applicable rules.
3. (A) If all rules are met, this department will validate
the application/permit and issue you and the
driller a copy of the permit.
The water supply system can then be installed.
(B) If any of the rules CAN NOT be
met, you will be notified in writing
within ten (10) day’s as to the reason(s) your
application/permit was
rejected. At that time you have thirty (30)
days in which to
appeal the decision to this department.
4. After the well log (in the case of a drilled well) is received
by this
department, will be sent to you listing the
items
still needing completion. A letter If another type
of water supply is to be installed, it will
be necessary
for you to notify this department when the system
has been installed.
To see the procedure for altering an existing water
system please click HERE
For the downloadable version of the new system procedure
please click HERE